The Eco Shark Barrier Pty Ltd team have successfully installed the swimming enclosure at Cottesloe Beach.
The 170 metre long enclosure was installed over three days, in beautiful clear conditions. Eco Shark Barrier Pty Ltd Director Craig Moss was pleased with the process and result.
“We were lucky to have good weather for the installation, which meant our team could easily assemble the panels on the beach before pulling them into the water “, Craig said.
“The enclosure at Cottesloe features the latest eco shark barrier design and technology. It has greater durability, larger breaking strain and better UV performance” he said.
The barrier will be seasonally installed between October and March each year.